Marathon Petroleum Bordeaux Terminal New Barge Dock Installation

Location:
Nashville, Tennessee

Owner:
Marathon Petroleum Corporation

Date:
March 2016 - December 2016

Amount:
$3,098,178

C.J. Mahan Construction Company, LLC was the Prime Contractor on this project which included civil site work for new barge dock float installation at Bordeaux Terminal located in Nashville, Tennessee on the Cumberland River.  The work scope consisted of installation of (5) – 72” and (5) – 36” diameter guide piles and monopiles socketed into bedrock, dock float installation including assembly of guide frames, bridge tower installation, construction of concrete landing for bridge, and assembly and installation of (2) steel truss access bridges from concrete landing to bridge tower and bridge tower to dock float, including all pile supports and handrail.